Roc Blanc school in Viladecavalls

C/ Pintor Casas
2002-2005
Project and Management
Client: Aj. Viladecavalls
Surface: 3.418,10 m²

In Viladecavalls was a school build in the early eighties of the last century with serious structural and accessibility problems,also it had become too small and needed to be provided with new services. The long land has a strong slope and the new services: kitchen, dining room and gym adapts longitudinally containing the land and a superior. The new classrooms solve the accessibility problems of the whole school and create alternatives circulations to the inacceptable architectural barriers. This is a work in which the architect’s job is to fix a building, repair and adapt it with ingenuity and discretion.